Bathroom makeover - Kings Park

This makeover included:

  • Structural modifications:

    • Demolished the storage room to enlarge the bathroom area

    • Added a toilet

    • Changed the entrance of the bathroom

  • Dismantled existing fixtures

  • Fixed leakage at shower area

  • Water and electrical system upgraded

  • Waterproofing

  • Tiling

  • Installed bathroom items