Bathroom makeover - Kings Park
This makeover included:
Structural modifications:
Demolished the storage room to enlarge the bathroom area
Added a toilet
Changed the entrance of the bathroom
Dismantled existing fixtures
Fixed leakage at shower area
Water and electrical system upgraded
Waterproofing
Tiling
Installed bathroom items

